PROJECT INFORMATION

Nghi Son 2 BOT Thermal Power Plant has a designed capacity of 1,200 MW, with a total investment capital of nearly 2,793 million USD. The project started construction in 2018 and is one of the very few coal-fired power plants in Vietnam that uses supercritical technology (USC) with high efficiency, significantly reducing coal consumption, generating energy greenhouse gas emissions and other environmental problems.

installed products

ANDRIS2 B

Storage water heater

go to the product page
small_image
FEATURE
– High-quality copper heating element.
– Temparature regulation.
– Total safety system.
– High density Insulation HDI keeps warm water up to 48h.
– 10% more hot water thanks to Flexomix technology.
– 5 star energy saving.